
Title
Barnstead
Thermolyne
NANOpure® DIamond™
Ultrapure Water System
Installation/Operation
Qualification
Protocol
BT.001.01.A
Customer
Protocol
____________
Revision
0
Customer
Revision
____________
Equipment ID
NANOpure®
DIamond™
Ultrapure
Water
System 1
Customer
____________
____________
____________
____________
____________
BT.001.01.A
09262000 Page 8 of 21
1 Unit Location/
Installation
continued
Model D11921 & D11931
Has the UF (ultrafilter) been
installed?
Model D11911 & D11931 has the UV
(ultraviolet) lamp been installed?
Has the float switch (P/N D8964)
been installed? (optional)
Has the pressure switch (P/N D2706)
been installed? (optional)
Has the cartridge pack been
installed?
Has initial sanitization of the unit
been performed?
(If not, sanitization must be
completed before proceeding with
IQ procedure:
refer to Initial sanitization procedure
in operating manuals)
Y N N/A
Y N N/A
Y N N/A
Y N N/A
Y N
Y N
Comments to this Manuals